Executive Workshop Dashboard
Vehicles in Workshop
7
-18% Wait Lead Time
Active Job Cards
6
2 Preventive • 4 Repairs
Pending Spare Reqs
4
Consolidated for PSO
Workforce Allocation
92%
11 Bay • 2 Field Breakdown
Cumulative Repair Cost
MUR 498,450
FY 2026/27 Plant & Fleet
Real-Time Fleet, Plant & Equipment Workshop Status
Instantaneous visibility into vehicle inspection, dismantling, parts procurement, and repair completion stages.
| Job Card / WO | Gov Plate & Asset | Parent Division / Station | Nature of Work | Current Workshop Stage | Lead Mechanic | Parts Status | Action |
|---|
Workshop Process Automation & Lead-Time Tracker
Replacing manual paper job cards with consolidated post-dismantling spare parts requests
Parent/Transport Division logs request. Scheduled slot eliminates yard congestion.
Digital Vehicle Examination Checklist completed on tablet during initial strip-down.
All required spare parts consolidated into one requisition to Purchasing & Supply Officer.
Supervisor signs off on Canvas Pad; labour, tyres, battery & MUR cost auto-posted.
Preventive Service & Store Alerts
Preventive Maintenance & Repair Appointment Registry
Track official Memos from Parent / Transport Divisions and schedule Richelieu Workshop inspection slots.
| Memo / Ref No. | Vehicle / Plant Plate | Originating Division | Maintenance Type | Reported Defect / Service | Appointment Date | Status | Workflow Action |
|---|
Ministry of Agro-Industry, Food Security, Blue Economy and Fisheries
Engineering Division — Workshop Section, Richelieu | Official Annex I Job Card & Examination Checklist
3. Vehicle & Plant Examination Checklist (Annex I)
Click status pills to toggle inspection findings between Serviceable (OK), Needs Repair/Spares, or Replaced.
| Date | Technician | Task Performed | Hrs |
|---|
| Item / Part Description | Qty | Store Voucher | Cost (MUR) |
|---|
I hereby certify that the above Government vehicle/plant has been thoroughly examined in accordance with Annex I guidelines, all required dismantling and spare part replacements have been logged, and roadworthiness/field safety checks are satisfactory.
Daily Labour Distribution Sheet & Work Progress (Annex I)
Assign Richelieu Workshop tradesmen across active bays and track mobile Field Breakdown Reports.
| Technician / Mechanic | Trade Designation | Assigned Work Order / Plate | Bay / Location | Allocated Task Description | Hours Logged | Work Progress |
|---|
Off-Site Field Report Forms (Mobile Breakdown Interventions)
Logged remotely via mobile tablets over SSL by roaming recovery teams
Request for Purchase of Spare Parts & Materials (Consolidated for PSO)
Generated strictly after complete dismantling of the vehicle so the Purchasing & Supply Officer processes a single consolidated requisition.
| Requisition ID | Job Card / Vehicle | Dismantling Verified | Consolidated Parts List | Est. Cost (MUR) | PSO Procurement Status | Action |
|---|
Official Tyre Register (Annex I)
Serial number, size, ply rating & mileage at issue
| Date | Plate | Tyre Size & Make | Serial No. | Odometer |
|---|
Official Battery Register (Annex I)
Ampere-hour capacity, serial number & warranty expiry
| Date | Plate | Spec / Make | Serial No. | Warranty Until |
|---|
Transfer of Spare Parts Form
Authorized inter-station or inter-vehicle parts allocation
| Transfer Voucher | Part Description | From Source | To Destination | Authorized By |
|---|
Scrapbook (Surplus / Returned Stores Voucher)
Unserviceable parts returned to Main Store for Board of Survey
| SRV Voucher | Removed From | Returned Unserviceable Item | Qty | Disposal Status |
|---|
Cumulative Cost for Repairs of Plants and Vehicles (Annex I Ledger)
Lifecycle expenditure analysis combining Spare Parts, Tyres, Batteries, and Workshop Labour overhead in Mauritian Rupees (MUR).
| Gov Plate | Plant / Vehicle Description | Division | No. of Jobs | Spares & Tyres (MUR) | Labour Cost (MUR) | Cumulative Total (MUR) | Economic Status |
|---|